Before the Cut
Ryan and Matt cut 2 huge blocks of concrete for the windows. It took about 1 1/2 for each block of concrete.
The Final Cut
Remodeling our basement into a separate living space for a small family of 4. We will chronicle some of the ways that we are able to do this remodel at 1/3 the normal cost.
No comments:
Post a Comment